One of our power plant customers had a 6” Vertical Turbine jockey pump on their fire sprinkler system. The pump was being replaced annually at a cost of $100,000 per event. The pump was oversized, it was subject to corrosion, and debris and sediment from the river was plugging it up. The pump itself cost […]
Mechanical Equipment Company custom designed, and built, a steam fired, hot process water circulating system for a regional health care company. The closed loop system needed to circulate up to 900 GPM of water, heat it to 205F using 125 PSIG steam, with a 14,800,000 BTU/hr heat load. While maximizing turndown, for process load variations. […]